|
| The Jade |
The Jade
by: Uppals Housing
Location: Faridabad
Send Request for More
Information |
Contact
Person:Mr. Kamal Wadhwa
Email:kamal@hindustanrealtors.com
Mobile:+91-9873922626 |
|
First time, a well established brand name enters in the field of Faridabad to provide a world class group housing society with unmatched quality and features.14 Acres with 85% open landscaped space with Water bodies - 670 Flats approx, with each flat getting its own view of the large green expanse. Large apartments with high end specifications with 3 & 4 BR & penthouses options.
Faridabad International standard apartment complex, Welcome to Uppal's, A 15 acre spacious residential complex, beautifully set amidst natural greens, in Sector - 86 Faridabad
|
|
 |
 |
|
3BHK-Tentative
Super Area 1556 Sq. Ft. |
3BHK-Servant Tentative
Super Area 1844 Sq. Ft. |
|
|
| |
| |
| SEISMIC CONSIDERATION |
Considering Zone-IV, Earthquake resistance RCC framed construction |
| LIVING, DINING & LOBBY/PASSAGE |
Floor - Vitrified Tiles Cornice in
drawing & dining areas.
Walls- Pleasing shades of OBD
Ceiling- POP cornices with Acrylic Emulsion |
| BEDROOMS |
Floor - Wooden laminated in 2 bedrooms& Vitrified Tiles in remaining bedrooms
Walls- Pleasing shades of OBD
Ceiling- OBD |
| BALCONIES |
Floor - Antiskid Ceramic Tiles
Walls / Ceiling - Permanent Paint Finish Wood work - Wardrobes in Mater Bedroom |
| KITCHEN |
Wall - Ceramic Tiles upto 2 feet above counter & OBD in balance area
Flooring - Antiskid Ceramic Tiles
Counter- Granite Fittings / Fixtures - Cp fittings SS Double bowl/single drain board Sink, Exhaust Fan |
| TOILETS (Except Servant's Toilet) |
Wall - Ceramic tiles till 7'0" height, Mirror & Acrylic Emulsion Combination
Flooring - Antiskid Ceramic Tiles
Counter- Granite Fittings / Fixtures - Standard: WC & Wash Basin & Towel Rail. CP fittings. |
| SERVANT ROOM |
Floor - Terrazo / Ceramic Tiles
Walls- OBD
Ceiling- OBD |
| DOORS |
Internal - Seasoned Hardwood frames with moulded skin shutters
Entrance Door- Teak Veneered & Polished shutter
External Doors & Windows- Aluminium / U.PVC / Wooden
Hardwares- Aluminium |
| ELECTRICAL |
Copper Electrical wiring throughout in concealed conduit with provisions for Light
point, Power point, TV & Phone Sockets with protective MCBs. Modular switches. |
| SECURITY SYSTEM /
FIRE FIGHTING SYSTEM |
SINGLE Entrance & Exit, gated community. CCTV in common areas. Fire Fighting
System. |
| CLUB FACILIY |
Club House, Health Club, Swimming Pool etc. |
|
|
|
|
| |
|
Initial
Price |
|
2 BHK |
1250 Sq. Ft. |
INR 1950/- per
Sq. Ft. |
INR 24,37,500/- |
INR 2,50,000/- |
|
3 BHK |
1556 Sq. Ft. |
INR 1950/- per
Sq. Ft. |
INR 30,34,200/- |
INR 3,00,000/- |
|
3 BHK + Servant |
1844 Sq. Ft. |
INR 1950/- per
Sq. Ft. |
INR 35,95,800/- |
INR 3,50,000/- | | |
PAYMENT PLAN |
|
Additional Charges |
|
|
Parking:
|
2,25,000/-
1,25,000/- |
|
ECC and FFC |
40/- per Sq. Ft. |
|
IFMS |
50/- per Sq. Ft. |
| EDC and Infrastructure Development Charge |
150/- per Sq. Ft. |
| Club Membership |
60,000/- |
| Power Back up |
25,000 per KVA |
| PLC |
As Applicable |
|
| |
|
TENTATIVE PAYMENT PLAN |
|
|
At The time of Booking &
Registration |
10 % of BSP |
|
With in 45 Days of Booking |
10% of BSP |
|
On Completion of foundation |
10% of BSP + 25% (EDC+IDC) |
|
On Casting of Stilt |
10% of BSP + 25% (EDC+IDC) |
|
On Casting of First Floor Roof |
7.5% of BSP + 25% (EDC+IDC) |
|
On Casting of Third Floor Roof |
7.5% of BSP + 25% (EDC+IDC) |
|
On Casting of Fifth Floor Roof |
7.5% of BSP + 50% OF PLC |
|
On Casting of Seventh Floor Roof |
7.5% of BSP + 50% OF PLC |
|
On Casting of Ninth Floor Roof |
7.5% of BSP + 50% ADDITIONAL
CHARGES |
|
On Casting of Eleventh Floor Roof |
7.5% of BSP + 50% ADDITIONAL
CHARGES |
|
On Internal Plaster |
5 % of BSP |
| On External Plaster |
5 % of BSP |
| On Possession |
5 % of BSP + OTHER
APPLICABLE CHARGES |
|
|
|
|