|
|
The RPS Group have setting up another milestone of 50 acres residential colony in Sector-88 at Faridabad.
the Company has got LOI(Letter of Intent) & Licence from the Director Township and Country Planning for the development of new project.Company had launched its Dream Project of "SAVANA" in Sec-88 at Faridabad on 2nd Sept 2006.
Located in Nahar-Paar Mega City at Faridabad (Haryana, India). It is in Sector-88 which will be near the approach road from the proposed Express-Highway coming from N.Delhi & Noida. It is expected to be preferred site for people coming from Delhi, Noida / Greater-Noida.
|
|
 |
 |
 |
Unit Layout Plan
Area Per Flat = 1250 sq. ft. |
Unit Layout Plan
Area Per Flat = 1303 sq. ft. |
Unit Layout Plan
Area Per Flat = 1590 sq. ft. |
 |
 |
 |
Unit Layout Plan
Area Per Flat = 1791 sq. ft. |
Unit Layout Plan
Area Per Flat = 2360 sq. ft. |
Pent House Plan
Area Per Flat = 2380 sq. ft. |
 |
 |
 |
Pent House Plan
Area Per Flat = 3170 sq. ft. |
Pent House Plan
Area Per Flat = 3560 sq. ft. |
Pent House Plan
Area Per Flat = 4595 sq. ft. |
|
| |
| |
|
Wall
Finish |
|
Internal |
|
|
: |
Painted in pleasing shades of Oil Bound
Distemper |
|
|
: |
Painted in Oil Bound
Distemper |
|
|
: |
Selected Marble/Granite cladding &
Acrylic Emulsion paint |
|
|
: |
Combination of Stone & Textured Paint
Finish |
|
Flooring |
|
|
: |
Vitrified Tile / Marble |
|
|
: |
Vitrified Flooring /
Marble |
|
|
: |
Ceramic Tiles |
|
|
: |
Anti Skid Ceramic Tiles |
|
|
: |
Selected Granite /
Marble |
|
|
: |
Anti Skid Ceramic Tiles |
|
Kitchen |
|
|
: |
Ceramic Tiles |
|
|
: |
Ceramic tiles above working platform,rest
Acrylic Emulsion Paint |
|
|
: |
Granite counter with stainless steel sink
with drain board. Provision for electric
chimney. |
|
Toilets |
|
|
: |
Selected ceramic tiles |
|
|
: |
Ceramic Tiles
/Granite/Marble |
|
|
: |
Granite/Marble counter,while sanitary
fixtures,single CP fittings |
|
Windows |
: |
Hardwood window |
|
Doors |
: |
Frame Hardwood/Door & moulded shutter
panel door |
|
Electrical
points |
: |
Conduit copper electrical wiring for all
light & power |
|
FACILITIES |
: |
100% Power backup . 24 x 7
security |
|
BUILDING |
: |
Sufficient car parking facility per
apartment Earthquake resistant RCC framed
construction |
|
CLUB |
: |
Swimming pool Gymnasium Indoor
games room Multi- purpose hall
|
|
|
|
|
|
|
|
|
|
|
| |
|
Initial
Price |
|
2Bed Rooms, Drawing/Dining,Kitchen, 2
Toilets & Balconies |
1250 sq.ft |
* 1st to Top Floor *P.H. (2380
sq.ft.) |
* 1900 psf * 2500
psf |
|
2 + 1 Bed Rooms, Drawing/Dining,
Kitchen, 2 Toilets & Balconies |
1303 sq.ft |
* 1st to Top Floor |
* 1900 psf |
|
3Bed Rooms, Drawing/Dining,Kitchen, 3
Toilets & Balconies |
1590 sq.ft |
* 1st to Top Floor *P.H. (3170
sq.ft.) |
* 1900 psf * 2500
psf |
|
3 + 1 Bed Rooms, Drawing/Dining,
Kitchen, 4 Toilets & Balconies |
1791 sq.ft |
* 1st to Top Floor *P.H. (3560
sq.ft.) |
* 1900 psf * 2500
psf |
|
4 + 1 Bed Rooms, Drawing/Dining,
Kitchen, 5 Toilets,
Balconies. |
2360 sq.ft |
* 1st to Top Floor *P.H. (4595
sq.ft.) |
* 2500 psf * 2500
psf | | |
| Additional
Charges(One Time
Payment) |
|
Car parking |
Open -Rs. 75,000/-
Covered -Rs. 1,50,000 /- |
|
Power backup Installation Charges 1 KVA
(2 B.R.) Minimum,2 KVA (3 B.R.) Minimum,5 KVA (4
B.R. & P.H.) Minimum |
Rs. 25,000/- per KVA (Maximum 10 KVA for
P.H. & 4+1 B.R.) & (Maximum 5 KVA for
others) |
|
Interest Free Maintenance
Security |
Rs. 20 /- Per Sq.ft. |
|
Club Membership |
Rs. 50,000
/- | |
|
Ist Floor |
5% of BSP |
|
Second Floor |
3% of BSP |
|
Green and Club Facing |
Rs. 100 /- per
sq.ft. | |
PAYMENT PLAN |
|
DOWN PAYMENT
PLAN |
|
|
At the time of booking
/registeration |
12.5% of BSP |
|
With in 45 Days of Booking |
8% Discount ON BSP+ 74.5% of
BSP +50% Additional Charges+100%
PLC |
|
At the time of Possession |
5% of BSP +50% Additional
Charges | |
| |
|
CONSTRUCTION - LINKED
PLAN |
|
|
At The time of Booking &
Registration |
12.5% of BSP |
|
With in 45 Days of Booking |
12.5% of BSP +25% PLC |
|
With in 75 Days of Booking |
10% of BSP + 25% PLC |
|
On Start of Excavation |
5% of BSP + 25% PLC |
|
On Completion of foundation |
5% of BSP + 25% PLC |
|
On Completion of Ground Floor roof Slab
casting |
5% of BSP |
|
On Completion of Second Floor roof Slab
casting |
10% of BSP |
|
On Completion of Fifth Floor roof Slab
casting |
10% of BSP |
|
On Completion of Seventh Floor roof Slab
casting |
10% of BSP |
|
On Completion of Last Floor roof Slab
casting |
5% of BSP |
|
On Completion of Internal
Plaster |
5% of BSP |
|
On Completion of
Flooring |
5% of BSP +50% Additional
Charges |
|
At the time of Possession |
5% of BSP +50% Additional
Charges | |
|
|
|